KAKATAR CE won the contract bid for the Provision of Engineering Infrastructure to Kyami District Zone C, Abuja in 2014. The contract involves, but not limited to, the construction of over 48km road network; construction of 10 river bridges (several dualised); construction of one 40m-dualised diamond interchange; construction of one 96m-dualised interchange with full cloverleaves; construction of storm water drainages; construction of foul water drainages (including three sewage treatment plants); provision of water supply distribution network; Construction of street lighting and power supply to the district; road network includes Expressways; Arterial Roads; Collector Roads, Important Local Streets, Local Streets, Minor Access Roads; Power supply consisting of 2 injection substations; 72 packet substations; 11 KV Cable of over 6,000 meters).

We immediately mobilised to site and started work. We are on site and have done Site Clearance and Earthworks. Road AR1 from Ch 0+000 to 1+000 completed; Road ILS 8 from Ch 0+000 to 0+800 completed, and other works are in progress – excavation, laying of pipe, backfill and construction of gullies are in progress; while Road works, placing of base course and pavement, Conduits for Post and Telecommunications, Excavation of trench, and laying of ducts, among others.

kyami%202_edited.jpg

KAKATAR 

TEAMWORK

It is teamwork at KAKATAR. Our on-site experts here discussing details about the designs, work plan  of the Kyami District Engineering Infrastructure.

MEN AT WORK

KAKATAR Workmen doing earthworks on the roads being constructed in the Kyami District to make them durable for the use of all.

kyami earth wprk.jpg
earth work.jpg

MEN, MACHINES

AND MATERIALS

Ongoing earthworks by combined team of Kakatar's men, machines and materials - constructing durable roads in Kyami District.

DIGGING DEEP

We dig deep to bury all necessary materials, lay the pipes that ensure free flow of stormwater, rainwater and make the roads dry as you drive safely, smoothly on them.

kyami%20site%20clearing_edited.jpg
DRAINAGE WORK.jpg

PROPER CHANNELLING

Constructing solid foundation for proper channelling, free flow of water in Kyami District.

ROAD CONSTRUCTION

Our professional men and special machines mix, lay the proper, hot concrete mixture on all roads we construct in Kyami District.